Who
EDA – Eletricidade dos Açores

What
Electrical EPC

When
In Operation since December 2024

Where
Pico Island, Azores, Portugal

Systems
2X 15kV Busbar
2X 30kV Busbar

Type
Distribution Substation
Portugal
The Siemens/WinPower Consortium was formed to make possible the design, supply, erection, and commissioning of the 30/15 kV substation in São Roque. This initiative aims to enhance the flexibility of the island’s distribution grid, replacing the outdated substation, which is currently located inside the island’s Thermoelectrical Power Plant.
The primary objective of this new facility is to manage all medium-voltage (MV) distribution lines of Pico, with a focus on the reinforcement of the connections to Madalena substation (through a new 30 kV overhead transmission line built by EDA), and the Lajes do Pico substation.
Additionally, the consortium is responsible for the installation of two 30/15 kV step-down transformers, which will supply the new 15 kV busbars, forming the origin of the 15 kV grid on Pico island.
To accommodate all the equipment required for the operation of the new substation, a dedicated building will be built, as well as an outdoor equipment park designed for power transformers and related components.
As an integral part of the local distribution electrical grid, this new substation will significantly strengthen EDA’s electrical infrastructures by improving system reliability and substantially increasing the required availability indexes.
Design, Supply, Installation, and Commissioning of a new 15/30 kV substation, including civil works and all related auxiliary systems, enhanced with a local Human-Machine Interface (HMI) system.
Who
EDA – Eletricidade dos Açores
What
Electrical EPC
When
In Operation since December 2024
Where
Pico Island, Azores, Portugal
Systems
2X 15kV Busbar
2X 30kV Busbar
Type
Distribution Substation
WinPower is committed to delivering a turnkey solution that integrates both the mechanical and electrical equipment of the substation, along with the associated civil structures.
From initial design and engineering to construction, our comprehensive approach ensures the delivery of a reliable, robust, and state-of-the-art solution. Our goal is to guarantee the continuous and uninterrupted operation of the installation, meeting the highest standards of performance and reliability.
Energy solutions designed and engineered by a team of experienced experts in the field.
Fogo Island
Cape Verde
Part of Cape Verde’s ongoing investment plans to enhance energy [...]
Boavista
Cape Verde
Green, reliable, and affordable energy is one of the sustainable drivers solving [...]
Santarém
Portugal
The project was the result of the Portuguese ongoing investment plans [...]