WinPower, S.A. is developing a new 1,280 kW power generation project on Maio Island, Cabo Verde, reinforcing local energy capacity,...
Sal Island Inaugurates New 6 MW / 6 MWh BESS with WinPower as EPC Contractor
WinPower, S.A. played a key role in the delivery of the 6 MW / 6 MWh Battery Energy Storage System...
Inauguration of the new 6 MW / 6 MWh BESS system on Santiago Island, Cape Verde
The new 6 MW / 6 MWh Battery Energy Storage System (BESS), designed and installed by WinPower, S.A. on Santiago...
ANNUAL TRADITION IN CABO VERDE
Every year, we embark on a mission to bring smiles to the faces of disadvantaged children in Cabo Verde.



