
Who
Cabeólica

What
Turnkey EPC Electrical BoP

When
2024

Where
Santiago Island, Cabo Verde

Systems
13,5 MW

Type
Windfarm BoP
Telefone: +351 987 654 321
Email: teste@winpower.com
Cabo Verde
This project is aligned with the client’s goal to produce electricity for the national grid as an independent producer, using the local’s naturally abundant wind energy. With the implementation of upcoming BESS projects there is an expectation to increase renewable energy penetration rate from 20% to approximately 30% in the country, during 2025.
This project, will enhance energy transmission capacity to the grid, increasing the volume of available energy for consumption and boosting revenue through increased sales. Its scope includes the design, installation, and commissioning of the windfarm’s electrical balance of plant and a warehouse in Santiago, under a Turnkey EPC contract signed in November, 2024 and the works initiated on the same month.
The core infrastructure of this project comprises and overhead transmission line, medium voltage switchgear, protection systems and cable connections that will ensure the integration of the windfarm into the national grid. These components will enable the safe and efficient transmission of electricity generated by the windfarm to the Offtaker substation.
The project is designed to establish a safe and efficient electrical connection, that meets contractual obligations, legal requirements and industry best practices.
Who
Cabeólica
What
Turnkey EPC Electrical BoP
When
2024
Where
Santiago Island, Cabo Verde
Systems
13,5 MW
Type
Windfarm BoP
WinPower is dedicated to delivering a turnkey solution that encompasses the electrical balance of plant for the windfarm expansion, along with all associated civil structures. Our comprehensive expertise, spans the entire project lifecycle – from initial design and engineering to construction and commissioning – ensuring a seamless and efficient execution.
Our commitment is to guarantee the safe operation of the installation and assure its continuous and uninterrupted operation.
Energy solutions designed and engineered by a team of experienced experts in the field.
Fogo Island
Cabo Verde
Part of Cabo Verde’s ongoing investment plans to enhance energy [...]
Boavista
Cabo Verde
Green, reliable, and affordable energy is one of the sustainable drivers solving [...]
Santarém
Portugal
The project was the result of the Portuguese ongoing investment plans [...]