Sal Island

Cabo Verde

Scada System
Grid Dispatch Center

As part of the construction and development of the new Cabo Verde Grid Dispatch Center in Praia, Santiago Island, the project comprised the integration of all existing electrical infrastructures, from transmission and distribution to power generation.

At the same time, there was a need to increase the penetration of the renewable resources in the generation mix, as well as the modernization of the existing grid infrastructures. The Palmeira Power Plant in Sal Island was integrated by WinPower within the new Grid Dispatch Centre of GE Energy, in Santiago Island.

Our Solution

Design, Supply, Installation & Commissioning for the integration of the Palmeira Power Plant and Sal Island Wind Farm Generation in the GE Dispatch Center. WinPower implemented one new MODBUS RTU interface network on the existing SCADA system.

In the local SCADA system two Automatic Generator Control (AGC) modes were implemented:

  1. AGC LOCAL: The baseload setpoint (MW) is managed by the operator, on the local SCADA system. In this mode all generators are completely operated by the local system.
  2. AGC REMOTE: All the setpoints and generators’ control were managed by the GE Dispatch Centre.

Who

GE Energy

What

Automation and Grid Integration Studies

When

Operational Since 2018

Where 

Sal Island, Cabo Verde

Systems

Power Plant SCADA System

Type

Grid Dispatch Centre

The Results

WinPower delivered a turnkey solution for the Palmeira Power Plant SCADA integration in the GE Dispatch Center. From design to engineering and commissioning, we delivered a reliable, robust and state-of-the-art solution, ensuring the continuous operation of the installation without interruptions.

Other Engineering Projects

Energy solutions designed and engineered by a team of experienced experts in the field.

EPC CONTRACT THERMAL POWER PLANT

Fogo Island

Cabo Verde

EPC CONTRACT THERMAL POWER PLANT

Part of Cabo Verde’s ongoing investment plans to enhance energy  [...]

Read More

FEASIBILITY STUDIES HYBRID GENERATION

Boavista


Cabo Verde

FEASIBILITY STUDIES HYBRID GENERATION

Green, reliable, and affordable energy is one of the sustainable drivers solving  [...]

Read More

BIOMASS POWER PLANT

Santarém

Portugal

BIOMASS POWER PLANT

The project was the result of the Portuguese ongoing investment plans [...]

Read More