Santo Antão Island

Cabo Verde

EPC Contract
Thermal Power Plant

EPC Contract Thermal Power Plant

Part of Cabo Verde’s ongoing investment plans to enhance energy generating capacity, reliability, and efficiency is the ORET project. Santo Antão Island relied on old diesel generators for electricity supply, which resulted not only in high operation costs and emissions but also in non-reliable energy supply for its people, industries, and tourism.

Our Solution

WinPower designed and built a new Power Plant with 2x 1,6 MW Gensets, operating at diesel with highly efficient MAN Engines and recovery boilers, and prepared for an extension of 2x more Gensets.

It was equipped with a Siemens SCADA System and remote access for 24/7 technical advisory support, complete with a 20 kV substation with earthing reactance and shunt reactors for power factor compensation.

The control system was prepared for load demand / baseload and load sharing, operating as base Power Plant to the island. This ensured three essential facts:

  1. Grid stability (frequency and voltage regulation)
  2. Spinning reserve
  3. Peak load demand, allowing the reliable integration of renewable energy systems in the 20 kV network.

Our O&M services, including remote technical advisory and major overhauls (with service engineers and spare parts supply), are a long-term commitment to our client needs and requirements.

Who

ELECTRA

What

EPC Services, Training Services, O&M Services, Technical Advisory Services

When

Operational Since 2015

Where 

Santo Antão Island, Cabo Verde

Systems

2x 1,6 MW 8L21/31 MAN Engines

Type

Diesel/HFO Island Mode

The Results

From design to engineering and O&M Services, including technical support, WinPower delivered a turnkey solution for a new Power Plant. System capacity was enhanced in a total of 3,2 MW, reliability was ensured with no blackouts, and the efficiency of local energy supply was improved, resulting in customers savings per kWh.

Other Engineering projects

Energy solutions designed and engineered by a team of experienced experts in the field.

Reinforcement of the Electricity Production and Distribution System

Fogo Island, Cabo Verde

Reinforcement of the Electricity Production and Distribution System

Part of Cabo Verde’s ongoing investment plans to enhance energy  [...]

Read More

Feasibility Studies for Hybrid Thermal and PV Power Plant

Boavista, Cabo Verde

Feasibility Studies for Hybrid Thermal and PV Power Plant

Green, reliable, and affordable energy is one of the sustainable drivers solving  [...]

Read More

Residual Biomass Power Plant

Residual Biomass Power Plant

The project was the result of the Portuguese ongoing investment plans [...]

Read More