Santiago, Sal, Boa Vista & Sao Vicente Islands

Cabo Verde

BESS EPC

WinPower has been awarded with two contracts for the supply and implementation of four BESS (Battery Energy Storage Facilities) facilities, located in Santiago, Sal, São Vicente and Boa Vista islands, in Cabo Verde.

Our Client, Cabeólica, is one of the most prominent independent energy producers in Cabo Verde, primarily due to their windfarm operations.

Each of these BESS units has three main goals:

  • Reduction of CO2 emissions;
  • Increase the penetration of renewable energy on the grid, from 20% to 30%, in line with the Agenda 2030 targets,
  • Enhance power quality in Cabo Verde, leveraging the capabilities of this advanced storage technology.

The BESS power plants of Santiago and Sal will be located near Cabeólica’s windfarms, with energy injected into the 20 kV busbars of each windfarm. In São Vicente and Boa Vista, the plants will be built near the thermoelectrical power plants, serving as injection points into the national grid.

These new Cabeólica facilities will strengthen the electrical infrastructure by improving system reliability and substantially increasing availability indexes.

This project, will enhance energy transmission capacity to the grid, increasing the volume of available energy for consumption and boosting revenue through increased sales. Its scope includes the design, installation, and commissioning of the windfarm’s electrical balance of plant and a warehouse in Santiago, under a Turnkey EPC contract signed in November, 2024.

1

Our Solution

Design, Supply, Construction, Installation, and Commissioning of four new BESS facilities (3 × 6 MW / 6 MWh for Santiago, Sal, and Boa Vista islands and 8 MW / 8 MWh for São Vicente), including civil works and all related auxiliary systems, enhanced with a local Energy Management System (EMS).

cliente preview rev 1

Who

Cabeólica

servicos preview rev 1

What

BESS EPC

operational since preview rev 1

When

2024

localizacao preview rev 1

Where 

Santiago, Sal, Boa Vista & São Vicente, Cabo Verde

systems preview rev 1

Systems

3 X 6 MW/6 MWh

1 X 8 MW/8 MWh

type preview rev 1

Type

EPC

The Results

WinPower is committed to delivering a full turnkey solution, integrating both civil works and electrical equipment for the BESS facilities.

From design and engineering – enabling the procurement of key equipment – to construction, our approach ensures the delivery of reliable, state-of-the-art solutions. Our success is driven by strong partnerships with all stakeholders.

Our goal is to contribute to the energy transition, supporting Cabo Verde in becoming a key player in the global effort to create a more sustainable planet.

Additionally, we are committed to ensuring and uninterrupted operation of these facilities, meeting the highest standards of performance and reliability.

Our commitment is to guarantee the safe operation of the installation and assure its continuous and uninterrupted operation. 

Other Engineering Projects

Energy solutions designed and engineered by a team of experienced experts in the field.

EPC CONTRACT THERMAL POWER PLANT

Fogo Island

Cabo Verde

EPC CONTRACT THERMAL POWER PLANT

Part of Cabo Verde’s ongoing investment plans to enhance energy  [...]

Read More

FEASIBILITY STUDIES HYBRID GENERATION

Boavista


Cabo Verde

FEASIBILITY STUDIES HYBRID GENERATION

Green, reliable, and affordable energy is one of the sustainable drivers solving  [...]

Read More

BIOMASS POWER PLANT

Santarém

Portugal

BIOMASS POWER PLANT

The project was the result of the Portuguese ongoing investment plans [...]

Read More