Boavista Island

Cabo Verde

Adaptation of Boa Vista’s Medium Voltage Network
for Integration into the National Dispatch System

The WinPower/C&S Engenharia consortium has been awarded the contract for the design, supply, installation, and commissioning of the infrastructure required to integrate the 20 kV electrical network of Boa Vista Island into Cabo Verde’s National Dispatch System.

The project includes the construction of new electrical substations, the refurbishment of existing facilities, and the modernization of critical network equipment, including the replacement of Medium Voltage switchgear and oil-immersed distribution transformers. It also includes the installation of new auxiliary DC power supply systems (24 VDC), creating the necessary conditions for the future implementation of automation and telecommunications systems.

This intervention represents a key step in the modernization of the island’s electrical network, enhancing its reliability, operational flexibility, and ability to integrate into a centralized management system for the national power grid.

boa vista 1 e1685033848830

Our Solution

WinPower, in partnership with C&S Engenharia, is delivering a comprehensive EPC (Engineering, Procurement and Construction) solution, covering all project phases, from detailed engineering through supply, construction, installation, and commissioning.

The solution includes:

  • Construction of new 20 kV substations;
  • Refurbishment and modernization of existing facilities;
  • Supply and installation of Low and Medium Voltage switchgear;
  • Installation of protection, metering, and control systems;
  • Implementation of auxiliary systems, including HVAC and DC power supply;
  • Execution of all associated civil and structural works;
  • Testing, system integration, and final commissioning.

The adopted approach ensures a technologically advanced solution based on state-of-the-art equipment and proven engineering and execution methodologies.

The Results

The project will enable the integration of Boa Vista’s electrical network into the National Dispatch System, creating the foundations for the future implementation of advanced automation and telecommunications systems.

The modernization of the electrical infrastructure will contribute to safer, more efficient, and more reliable network operation, reducing operational risks and unplanned outages while ensuring high levels of performance, availability, and operational sustainability.

cliente preview rev 1

Who?

Ministério da Indústria, Comércio e Energia (MICE)

servicos preview rev 1

Area of Intervention

Integration of the 20 kV Network into the National Dispatch System

tools

Services

Electrical EPC and Civil Works

operational since preview rev 1

When?

Execution Period: October 2024 – Ongoing

localizacao preview rev 1

Where?

Boa Vista, Cabo Verde

budget

Funding

LuxDev – Luxembourg Development Agency

type preview rev 1

Type

Medium Voltage Electrical Network Infrastructure

Other Engineering Projects

Energy solutions designed and engineered by a team of experienced experts in the field.

EPC CONTRACT THERMAL POWER PLANT

Fogo Island

Cabo Verde

EPC CONTRACT THERMAL POWER PLANT

Part of Cabo Verde’s ongoing investment plans to enhance energy  [...]

Read More

FEASIBILITY STUDIES HYBRID GENERATION

Boavista


Cabo Verde

FEASIBILITY STUDIES HYBRID GENERATION

Green, reliable, and affordable energy is one of the sustainable drivers solving  [...]

Read More

BIOMASS POWER PLANT

Santarém

Portugal

BIOMASS POWER PLANT

The project was the result of the Portuguese ongoing investment plans [...]

Read More