WinPower, boost local energy.

You are here: Home » Media Center » News » Huambo Thermal Power Plant, Angola

Huambo Thermal Power Plant, Angola

August, 2012

Start of construction of the Huambo Power Plant
The land was released in August 2012 for green field construction of the Huambo power plant by the WinPower, Zagope and Grupo Gema Consortium. The Huambo power plant was designed using the BOOST System technology. The plant was designed to produce 15 MW, being comprised of 4 MAN 18V28/ 32S generator groups with a BOOST Powerbox configuration. The plant will be able to supply, at maximum capacity, the annual energy demands of 423 thousand inhabitants (considering the Angolan per capita consumption).